ADLT Office Solar Energy System Installation

By ADLT  -  On 21 May, 2018 -  0 comments

Keen to increase our commitment to sustainable energy, we recently installed a large solar energy system at our Australasian headquarters in Melbourne’s eastern surburbs.

The system includes over 200 solar panels feeding into 3 inverters, and has a capacity of 60 kW. Batteries storage can be added in future if desired.

Click here to read the full story!

Sustainable Energy